How to get to REC Photovoltaic Panel Manufacturing Plant from Bedok MRT Station by MRT, LRT or Bus?
Quick Search
Journey Planner 2023
- Start : Bedok MRT Station ( EW5 )
- Destination : REC Photovoltaic Panel Manufacturing Plant
- Transport Mode : Train, Bus or LRT/Tram
- Postal Code : 637312
- Category : Industrial / Manufacturing Plants
- Date : 03 Oct 2023
- Start Trip Time : 9:07 AM
- Reach Destination Time : 10:59 AM
Timings based on local Singapore time.
Step By Step Guide
- Start your journey from BEDOK MRT STATION (EW5). For assistance on train fares, tickets, prices, payment methods or EZ-Link smart card information, please approach SMRT Corporation Passenger Customer Service Counter at the station or go to the official SMRT Corporation website for more information. 
- Take EAST WEST LINE train from BEDOK MRT STATION (EW5) for 28 stations to TUAS LINK MRT STATION (EW33). SUBWAY SMRT Corporation 1hrs 9mins 39.11 km 9:07 AM
- Click to show stops
- Your train ride will have 27 intermediate stops at KEMBANGAN MRT STATION (EW6), EUNOS MRT STATION (EW7), PAYA LEBAR MRT STATION (EW8), ALJUNIED MRT STATION (EW9), KALLANG MRT STATION (EW10), LAVENDER MRT STATION (EW11), BUGIS MRT STATION (EW12), CITY HALL MRT STATION (EW13), RAFFLES PLACE MRT STATION (EW14), TANJONG PAGAR MRT STATION (EW15), OUTRAM PARK MRT STATION (EW16), TIONG BAHRU MRT STATION (EW17), REDHILL MRT STATION (EW18), QUEENSTOWN MRT STATION (EW19), COMMONWEALTH MRT STATION (EW20), BUONA VISTA MRT STATION (EW21), DOVER MRT STATION (EW22), CLEMENTI MRT STATION (EW23), JURONG EAST MRT STATION (EW24), CHINESE GARDEN MRT STATION (EW25), LAKESIDE MRT STATION (EW26), BOON LAY MRT STATION (EW27), PIONEER MRT STATION (EW28), JOO KOON MRT STATION (EW29), GUL CIRCLE MRT STATION (EW30), TUAS CRESCENT MRT STATION (EW31) and TUAS WEST ROAD MRT STATION (EW32). SUBWAY SMRT Corporation
- Walk from TUAS LINK MRT STATION (EW33) to OPP TUAS LK STN (25421) bus stop. WALKING 1 min 128.06 m 10:18 AM
- Transfer from Train to Bus at OPP TUAS LK STN (25421) bus stop. Transfer
- Take bus no 248M from OPP TUAS LK STN (25421) bus stop for 13 stops to AFT TUAS STH BLVD (25059). BUS SBS Transit 33 mins 9.20 km 10:18 AM
- Click to show stops
- Your bus ride will have 12 intermediate stops at SUPER CONTINENTAL (25431), BEF PIONEER RD (25441), BEF TUAS WEST AVE (25681), AFT TUAS WEST RD STN (25691), BASF STH EAST ASIA (26101), ROTARY ENGRG (26091), BEF TUAS AVE 18A (26081), UNIFINE STAR PETROCHEM (26071), GLAXOSMITHKLINE (25701), OPP THE INDEX (25711), HALLIBURTON (25741) and BEF TUAS STH AVE 14 (25751). BUS SBS Transit
- Walk from AFT TUAS STH BLVD (25059) bus stop to REC PHOTOVOLTAIC PANEL MANUFACTURING PLANT WALKING 8 mins 619.02 m 10:51 AM
- You have reached your INDUSTRIAL / MANUFACTURING PLANT destination. 
Travel Summary
- Total Travel Time : 1 hour 52 minutes
- Total Waiting Time : 2 minutes
- Total Travel Distance : 49.06 km
- Total Walking Distance : 747.08 m
- Total Stops : 41 stops
- Total Transfer : 1
- Public Transport Operator : 2
- SMRT No. : 1800 336 8900
- SBS Transit No. : 1800 287 2727
- Data updated as of 01 Jul 2023
- The values above are based on estimates only. Actual values may vary depending on factors such as traffic, time of day, and other unforeseen circumstances. It's always a good idea to check for real-time updates before starting your journey.