How to get to Proposed Development of Facilities and Infrastructure at Seletar from Lentor MRT Station by MRT, LRT or Bus?
- No Service Note : There are no available public transport operators running the transit route from Lentor MRT Station to Proposed Development of Facilities and Infrastructure at Seletar. Thus the route directions data below are showing Walking Mode only. You may refer to the map below to guide you for walking directions.
Quick Search
Journey Planner 2024
- Start : Lentor MRT Station ( TE5 )
- Destination : Proposed Development of Facilities and Infrastructure at Seletar
- Transport Mode : Train, Bus or LRT/Tram
- Postal Code : 797770
- Category : Airports / Airports
- Date : 18 Sep 2024
- Start Trip Time : 9:00 AM
- Reach Destination Time : 10:28 AM
Timings based on local Singapore time.
Step By Step Guide
- Walk to PROPOSED DEVELOPMENT OF FACILITIES AND INFRASTRUCTURE AT SELETAR WALKING 89 mins 7388.00 m 9:00 AM
- You have reached your AIRPORTS / AIRPORT destination. 
Travel Summary
- Total Adult Fare (SGD) : $0.00
- Total Travel Time : 1 hour 38 minutes
- Total Waiting Time : 0 minutes
- Total Travel Distance : 7.39 km
- Total Walking Distance : 7388.00 m
- Total Stops : 0 stop
- Total Transfer : 0
- The values above are based on estimates only. Actual values may vary depending on factors such as traffic, time of day, and other unforeseen circumstances. It's always a good idea to check for real-time updates before starting your journey.